-- card: 39404 from stack: in -- bmap block id: 39715 -- flags: 0000 -- background id: 3633 -- name: Elapsed Time -- part 38 (field) -- low flags: 01 -- high flags: 0000 -- rect: left=245 top=69 right=155 bottom=321 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 0 -- font id: 3 -- text size: 9 -- style flags: 0 -- line height: 12 -- part name: callout -- part 39 (button) -- low flags: 00 -- high flags: A003 -- rect: left=12 top=243 right=266 bottom=239 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 1 -- font id: 3 -- text size: 10 -- style flags: 0 -- line height: 13 -- part name: Specifying Attributes for the Schedule Chart ----- HyperTalk script ----- on mouseUp go card id 2228 end mouseUp -- part contents for background part 6 ----- text ----- The elapsed time for a task is the amount of calendar time the task takes, plus any nonworking time. For example, suppose it takes three days to prepare drawings (duration) and you begin work on Friday, October 21 (Earliest Start). With the usual Monday through Friday work week, the elapsed time for the task would be 5 days. These attributes can all be displayed in the Schedule Chart. -- part contents for background part 7 ----- text ----- Duration and elapsed time are also shown in the Project Table. The charts that are based on a span of time—the Resource Timeline, Task Timeline, and Resource Histogram—give their information in elapsed time. -- part contents for background part 27 ----- text ----- Schedule Information -- part contents for background part 28 ----- text ----- Elapsed Time -- part contents for card part 38 ----- text ----- Duration Earliest Start date Elapsed time